It is shown how supervision of 229 route-miles operated by program machines and automatic interlockings is carried out from four control rooms; schematic diagrams of supervision of program machine operated interlocking, and of train number writer and recorder.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Traffic control rooms on London transport


    Additional title:

    Ry Gaz


    Contributors:
    Wager, E.W. (author)

    Published in:

    Railway Gazette ; 124 , n 6


    Publication date :

    1968


    Size :

    6 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Dutsch traffic control rooms: nationwide flexibility by design

    Schmeink, Bart / Smeden, Klaas van | IuD Bahn | 2004


    Control system for London transport tram and trollybus traffic

    Tilston, T.J. | Engineering Index Backfile | 1942


    London traffic control

    Engineering Index Backfile | 1949


    Control rooms ergonomy

    Speran Dio, J. C. | British Library Online Contents | 1995


    Human machine teaming in the air traffic control operations rooms: The IFATCA’s perspective

    Stathis, Malakis / Marc, Baumgartner / Nora, Berzina et al. | Elsevier | 2025

    Free access