One-mile tunnel between Hill St. Terminal of Pacific Elec. Ry. and Glendale Blvd.; should be completed in 2 yr.
Projected subway in Los Angeles
Elec. Ry. Jl
Electric Railway Journal ; 59 , n 18
1922
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1924
Highway subway constructed under runways of Los Angeles international airport
Engineering Index Backfile | 1953
|The broad street subway and Philadelphia's projected high-speed transportation system
Engineering Index Backfile | 1930
|British Library Conference Proceedings | 1995
|