Investigation conducted in 5×18×119-ft concrete flume; models to scales of 1:30, 1:45, and 1:60 were used; test results; accuracy of formulas for design of rubble mound breakwaters; most important findings concerned use of Iribarren's formula.
Stability of rubble-mound breakwaters
US Waterways Experiment Station -- Tech Memo
1953
66 pages
44 Supp Plates, 11 p Appendices
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Researches on stability of rubble-mound breakwaters
TIBKAT | 1978
|Analysis of Rubble Mound Breakwaters
British Library Conference Proceedings | 1992
|Stability of Rubble Mound Submerged and Overtopped Breakwaters
British Library Conference Proceedings | 1994
|Conceptual design of rubble mound breakwaters
TIBKAT | 1993
|Wave Overtopping Over Rubble Mound Breakwaters
British Library Conference Proceedings | 2001
|