Annual report recording progress made on officially approved general electrification of all Austrian main railways; completely finished and in regular schedule operation are Arlberg line (136 km.) and Salzkammergut line (107 km.); work is in progress on lines east of Innsbruck up to Salzburg; details of hydroelectric stations supplying roads; data concerning hydraulic and electric parts; most of apparatus is directly for 16 2/3-cycle single-phase current; locomotive types.
The electrification of the Austrian state railway: A retrospect and a glance ahead
Die Elektrisierung der Oesterreichischen Bundesbahnen; Ruckblick und Ausblick
Elektrotechnik und Maschinenbau ; 44 , n 20
1926
28 pages
39 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Austrian railway electrification
Engineering Index Backfile | 1921
|Electrification of the austrian state railway
Engineering Index Backfile | 1921
|Electrification of the austrian state railway
Engineering Index Backfile | 1921
|Electrification of the austrian state railway
Engineering Index Backfile | 1921
|Electrification of austrian federal railway. Locomotives
Engineering Index Backfile | 1926
|