Annual report recording progress made on officially approved general electrification of all Austrian main railways; completely finished and in regular schedule operation are Arlberg line (136 km.) and Salzkammergut line (107 km.); work is in progress on lines east of Innsbruck up to Salzburg; details of hydroelectric stations supplying roads; data concerning hydraulic and electric parts; most of apparatus is directly for 16 2/3-cycle single-phase current; locomotive types.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    The electrification of the Austrian state railway: A retrospect and a glance ahead


    Additional title:

    Die Elektrisierung der Oesterreichischen Bundesbahnen; Ruckblick und Ausblick


    Contributors:
    Dittes, P. (author)

    Published in:

    Publication date :

    1926


    Size :

    28 pages


    Remarks:

    39 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Austrian railway electrification

    Dittes, P. | Engineering Index Backfile | 1921


    Electrification of the austrian state railway

    Dittes, Paul. | Engineering Index Backfile | 1921


    Electrification of the austrian state railway

    Dittes, Paul | Engineering Index Backfile | 1921


    Electrification of the austrian state railway

    Dittes, Paul. | Engineering Index Backfile | 1921


    Electrification of austrian federal railway. Locomotives

    Lorenz, R. | Engineering Index Backfile | 1926