Missouri Pacific demonstrates marked economy of this practice in two instances.
Jacking culvert through embankment cuts cost two-thirds
Ry. Eng. Maintenance
Railway Engineering and Maintenance ; 22 , n 3
1926
4 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1921
Jacking culvert through railway fill aided by top shield
Engineering Index Backfile | 1928
|The placing of culvert pipes by jacking or tunnelling
Engineering Index Backfile | 1929
Jacking trolley for quickly assembling culvert sections and control method
European Patent Office | 2021
|