Reliability programs undertaken by Martin-Denver Div while developing various Titan ICBM missile systems; summary of tasks to be accomplished for engineering portion of Reliability Program for Titan I and Titan II are analyzed; reliability measurement and demonstration involving flight and captive firing performance, including countdown, performance of subsystems and components as measured by functions during checkout, countdown, and simulated flight exercises; demonstrated margins of safety in all reliability and qualification tests; failure report summaries, acceptance test report summaries, and data from subsystem mockups; failure reporting and failure analysis program; program similarity, etc.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Titan reliability program


    Additional title:

    SAE -- Paper


    Contributors:

    Conference:

    SAE Meeting ; 1964 Reliability



    Publication date :

    1964


    Size :

    12 pages


    Type of media :

    Conference paper


    Type of material :

    Print


    Language :

    English




    The Titan Reliability Program

    Thompson, F. A. / Stein, W. D. | SAE Technical Papers | 1964


    Titan IV Program

    NTIS | 1992


    Titan III interface program

    Hibsman, D.E. / Rector, R.W. | Engineering Index Backfile | 1966


    Titan Launch Vehicle Program overview

    Frew, Jeffrey / Currier, Ian | AIAA | 1997