Survey of contractors' operations on eastern portion of "Toronto By-Pass" section of King's Highway 401, controlled access dual highway; median strip is 34 ft wide, driving lanes are 11 ft, and passing lanes are 12 ft; interchanges are of cloverleaf type; grading operations and equipment.
Controlled-access highway completed around city of Toronto
Roads Eng Construction
Roads and Engineering Construction ; 94 , n 7
1956
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway from Toronto to Barrie
Engineering Index Backfile | 1946
First unit of reconstruction on Franklin canyon highway completed
Engineering Index Backfile | 1943
|Highway improvement advocated by Toronto planning board
Engineering Index Backfile | 1947