Illustrated description of the material handling plant at the Miraflores locks and the Pedro Miguel lock. (3000 w.) (No. 8063)
Construction plants for the Pacific locks of the Panama canal
Eng Rec
1909
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Overhaul of locks in Panama Canal
Engineering Index Backfile | 1962
|Engineering Index Backfile | 1909
Floating caisson for the Panama canal locks
Engineering Index Backfile | 1914
|The Panama Canal´s Third Set of Locks Project
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2012
|How the locks of the Panama canal are operated
Engineering Index Backfile | 1914