Adopted scheme provides for: (1) diversion of river to westward; (2) construction of breakwaters for purpose of eliminating "range" within harbor; and (3) construction of wharves, slipway, railway and other facilities.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Gisborne harbour works, New Zealand


    Additional title:

    Engineer


    Published in:

    Engineer ; 145 , n 3762


    Publication date :

    1928


    Size :

    2 pages


    Remarks:

    5 Figs. partly on p. 184


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Cochin harbour works

    Bristow, R.C. | Engineering Index Backfile | 1930


    Jaffa harbour works

    Engineering Index Backfile | 1935


    Redesign of Port Gisborne for the 21st Century

    Healy, T. / Black, K. / Gorman, R. et al. | British Library Conference Proceedings | 1997


    Redesign of Port Gisborne for the 21st Century

    Healy, T. / Black, K. / Gorman, R. et al. | British Library Conference Proceedings | 1997


    New harbour works at Dunkirk

    Engineering Index Backfile | 1935