Installation represents application of much-discussed type of overhead construction: 6600-volt three-phase system has been replaced by 11,000-volt single-phase with overhead catenary contact system; overhead in snowsheds and tunnels; pole construction on curved track; design requirements; all catenary systems should be completely designed and special work taken into account before erection is begun.
Inclined catenary on the Great Northern
Ry. Elec. Engr
Railway Electrical Engineer ; 19 , n 4
1928
5 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway inclined catenary standardized design
Engineering Index Backfile | 1927
|Catenary construction on the Syracuse, Lake Shore, and Northern Railroad
Engineering Index Backfile | 1908
Catenary construction vehicles
Online Contents | 1998
|