Describes first recorded application of Armco jacking method in new field of service; installing two separate 30-in. pipe lines under main canal at Donna, Texas; drainage-ditch crossing; difficulties encountered.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Drainage lines installed under irrigation main without interrupting water delivery


    Additional title:

    Highway Mag


    Contributors:

    Published in:

    Publication date :

    1928


    Size :

    3 pages


    Remarks:

    4 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Highway bridge moved without interrupting traffic

    Engineering Index Backfile | 1927





    INTERRUPTING DEVICE, INTERRUPTING METHOD, AND COMPUTER PROGRAM

    SUGISAWA YUUKI | European Patent Office | 2018

    Free access