Installation at Ontario portal situated at Keetley, Utah; essential features are Well-man-Seaver-Morgan car tipple and steel pan conveyor, dumping direct into standard railroad cars placed on either side of tipple; three men employed; under previous conditions, ten men were required.
The new tipple of the park Utah consolidated
Eng. Min. Jl
Engineering and Mining Journal ; 125 , n 20
1928
2 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Making motors change their tipple
Tema Archive | 1991
|"Tipple Nickel" opät na Slovensku
Online Contents | 2001
Transportation Research Record | 2019
|