New lock being built west of Terneuzen will admit ships up to 50,000 tdw; gates are of sliding type; pivoting bridges at each end of lock provide land traffic facilities; filling- and emptying-time of lock will be 13 min; number of measures taken to prevent intrusion of brackish water into ship canal are described. (40748)
New ship-canal lock in terneuzen (Scheldt Estuary)
De nieuwe zeevaartsluis te Terneuzen
5th International Harbour Congress ; 1968 ; Belgium , Antwerp Locks
1968
5 pages
Conference paper
Dutch
© Metadata Copyright Elsevier B. V. All rights reserved.
Two-Dimensional Hydrodynamic Model of the Port of Terneuzen (Scheldt Estuary, The Netherlands)
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2013
|Mer & Ports - Gand : Le canal Gand-Terneuzen à 16 m
Online Contents | 2006
II y a 80 ans... -- Le canal de Terneuzen
Online Contents | 2008
The Scheldt Estuary Development Project
British Library Conference Proceedings | 2007
|Zevenaar harbor in port of Terneuzen
Engineering Index Backfile | 1938
|