Main highway tunnel is intended for vehicular traffic only; access ramps have 1:25 gradient; at its lowest point roadway is 19.95 m below normal water level in Canal, which has depth of 11.13 m; overall length of tunnel, including ramps, is 1279 m; it is twin structure, each longitudinal half of which accommodates 6.80 m wide two lane roadway; information is given on design, construction, and ventilating equipment.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Highway tunnel under Kiel Canal at Rendsburg


    Additional title:

    Dock Harbour Authority


    Published in:

    Publication date :

    1960


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Tunnel Rendsburg (Heute)

    Adolf Nissen Elektrobau GmbH & Co. KG | Mobilithek

    Free access

    Tunnel Rendsburg (Historische Daten)

    Adolf Nissen Elektrobau GmbH & Co. KG | Mobilithek

    Free access

    Meßtechnische Auswertung für die PV-Anlage "Tunnel Rendsburg"

    Wirtschaft-und-Infrastruktur-GmbH-und-Co. -Planungs-KG, München | TIBKAT | 1993


    The Kiel Canal

    Brockmann, Jörg / Heeling, Anne / Pohl, Martin et al. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2008

    Free access

    The Kiel Canal

    Brockmann, Jörg / Heeling, Anne / Pohl, Martin et al. | BASE | 2008

    Free access