Account of suburban and main-line electrification scheme; route mileage equipped is 181.4 mi and length of track, including sidings, 571 mi; total capacity of plant installed in 15 substations is 100,000 kw and that in generating station 40,000 kw. (See also Instn Elec Engrs -- J v 71 n 432 Dec 1932 p 911-51 (discussion) p 951-7 1 supp plate; Inst Transport -- J v 13 n 8 June 1932 p 411-31 (discussion) p 431-4)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electrification of suburban and certain main-line sections of Great Indian Peninsula railway


    Additional title:

    Engineer


    Contributors:
    Lydall, F. (author)

    Published in:

    Engineer ; 153 , n 3982


    Publication date :

    1932


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English