Results of traffic surveys at Tyneside conurbation are described at 53 points; from coded results of roadside interviews, tabulations of interzonal flows were produced, and are being used for predicting future traffic movements on basis of J.C.Tanner equation which assumes that traffic flow is proportional to population of pair of zones and distance between them; home questionnaires were distributed and results analyzed on car ownership and trip generation; surveys were made of trip times, and speed per vehicle concentration relations were established.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Tyneside conurbation traffic survey


    Additional title:

    Traffic Eng Control


    Contributors:
    Dobson, G.G. (author) / Murray, G.L. (author)

    Published in:

    Publication date :

    1967


    Size :

    4 pages


    Type of media :

    Report


    Type of material :

    Print


    Language :

    English




    Railway electrification of tyneside

    Engineering Index Backfile | 1938


    Electric traction on Tyneside

    Engineering Index Backfile | 1902


    New Tyneside dry dock

    Engineering Index Backfile | 1954


    Railway electrification of tyneside

    Engineering Index Backfile | 1938


    Tyneside electrified lines of L.N.E.R

    Engineering Index Backfile | 1939