The invention provides a dry dock wall construction process. The dry dock wall construction process comprises the following steps that 1, a foundation pit is excavated, and one surface of the finallyexcavated foundation pit is step-shaped; 2, a plurality of parallel cast-in-place piles are constructed at the bottommost end of the step-shaped face of the foundation pit; 3, buttress concrete is poured on the plurality of cast-in-place piles in two times; and 4, the foundation pit in the first step is backfilled in a layered mode, one face of a structure formed through backfilling is also in a step shape finally, and the number of the step-shaped steps in the fourth step is smaller than that of the step-shaped steps in the first step. According to the dry dock wall construction process, thefoundation pit is excavated in a step shape, the gradient of the slope of the foundation pit can be reduced, and construction is facilitated. Cast-in-place pile construction is conducted at the bottomend of the step-shaped foundation pit, the bearing capacity of the pit bottom of the foundation pit can be protected, and the step-shaped face of the foundation pit can be prevented from collapsing.

    本发明提供了一种干船坞坞墙施工工艺,包括以下步骤:步骤一、开挖基坑,最终开挖的基坑一个面呈台阶状;步骤二、在基坑呈台阶状面的最底端施工多根平行的灌注桩;步骤三、在多根灌注桩的上方分两次浇筑扶壁混凝土;步骤四、分层回填步骤一的基坑,最终回填形成结构的一个面也呈台阶状,步骤四的台阶状台阶数少于步骤一台阶状的台阶数。本发明呈台阶状开挖基坑,既有利于降低基坑斜面的坡度还便于施工。本发明在台阶状基坑的底端进行灌注桩施工,既能保护基坑坑底的承载能力又能防止基坑呈台阶状的面坍塌。


    Access

    Download


    Export, share and cite



    Title :

    Dry dock wall construction process


    Additional title:

    一种干船坞坞墙施工工艺


    Contributors:
    TAO YUN (author) / CHAI HAO (author) / JIANG RONGHUA (author) / MIAO YANSUI (author) / HAN JINLIN (author) / WANG BIN (author) / WANG LIU (author) / HU WEIHAI (author) / ZHAO JIAWANG (author) / HUANG PANWEN (author)

    Publication date :

    2020-07-03


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E02D FOUNDATIONS , Gründungen / B63C LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS , Zuwasserlassen, Trockenstellen, Docken oder Bergen von Schiffen



    Dry dock wall post-backfill construction method

    TAO YUN / HU WEIHAI / MIAO YANSUI et al. | European Patent Office | 2020

    Free access

    Notes on dock wall design and construction

    Brown, R.D. | Engineering Index Backfile | 1944


    Winter construction process of large dock wall concrete in severe cold areas

    MIAO YANSUI / WANG LIU / TAO YUN et al. | European Patent Office | 2020

    Free access

    Floating dock construction

    WOODWARD ANTHONY M | European Patent Office | 2021

    Free access

    Bethlehem's new construction dock

    Engineering Index Backfile | 1958