The invention discloses a rail transit main and standby control center control right switching method based on an integrated monitoring system. A main/standby center right transfer function is used for a train automatic monitoring system (including a vehicle system), an electric power monitoring system, an environment monitoring system and a communication system. Master/standby center control right switching of a plurality of systems is completed through one center system, and availability of the whole set of system in one center is guaranteed; one central system is used for carrying out a fused handover mode of forced switching, switching application and handover application on other central systems.
本申请公开了一种基于综合监控系统的轨道交通主备控制中心控制权切换方法,包括主/备中心权限移交功能针对列车自动监控系统(含车辆系统)、电力监控系统、环境监控系统、通信系统四个系统;通过一个中心系统完成对多个系统的主/备中心控制权切换,保证一个中心内整套系统的可用;通过一个中心系统对对其他中心系统进行强制切换、申请切换、申请交出的融合移交方式。
Rail transit main and standby control center control right switching method based on comprehensive monitoring system
一种基于综合监控系统的轨道交通主备控制中心控制权切换方法
2023-06-09
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Main and standby control center switching method and rail transit comprehensive monitoring system
European Patent Office | 2021
|Control center main and standby system for urban rail transit signal system
European Patent Office | 2022
|European Patent Office | 2024
|