According to the jumping elevator and the jumping method thereof, the highest service floor of the jumping elevator is the top of a steel platform, operators on the steel platform can directly reach the highest operation plane, so that the operators on the steel platform can directly reach the top of the steel platform safely, quickly, efficiently and conveniently, and the operation difficulty in actual engineering can be solved; moreover, parts on the top of the hoistway, such as the limit position switch, can be naturally moved to a new position along with the jumping of an elevator machine room, and additional moving and mounting work is not needed, so that the elevator stopping time during the jumping period of the elevator is effectively shortened; in addition, after the top of the building is sealed, a jumping elevator machine room can be reserved to serve as a final machine room of a formal elevator, materials are saved, and the construction period is shortened.
本发明公开了一种跃升电梯及其跃升方法,其最高可服务楼层就是钢平台顶部,钢平台上的作业人员可以直达最高作业平面,使得钢平台作业人员能够安全、快速、高效、便捷地直达钢平台顶部,能解决实际工程中的作业困难;而且,极限位置开关等井道顶部的部件随着电梯机房的跃升能自然移动到新的位置,不需要额外的移装工作,有效降低了电梯跃升期间的停梯时间;另外,当建筑封顶后可保留跃升电梯机房作为正式电梯的最终机房,既节省物料又节省工期。
Jumping elevator and jumping method thereof
跃升电梯及其跃升方法
2023-06-16
Patent
Electronic Resource
Chinese
IPC: | B66B Aufzüge , ELEVATORS |
JUMPING ELEVATOR SYSTEM AND JUMPING METHOD USED IN CONSTRUCTION PROCESS OF BUILDING
European Patent Office | 2025
|