The invention relates to a crane rail closing treatment structure during crane beam fire-fighting linkage and a construction method thereof. The method is suitable for the field of crane rail closing treatment. According to the technical scheme, the device comprises a steel reinforcement framework, a lifting beam bracket, a bracket support for a movable lifting beam, an embedded plate, a movable lifting beam base support with pulleys, the movable lifting beam, a linkage driving motor support, a fixed lifting beam and a fireproof rolling shutter door unit. The movable crane beam base support with the pulley is connected with the pre-embedded plate in a welding manner; the movable crane beam is mounted on the movable crane beam base support with the pulleys; the linkage driving motor support is connected with the embedded plate in a welded mode. A double-linkage driving motor is arranged on the linkage driving motor bracket, and the double-linkage driving motor drives the movable crane beam to move longitudinally when running; the fixed crane beam is installed on one side of the movable crane beam, and when the fixed crane beam and the movable crane beam are folded, the hoisting mechanism trolley track on the upper portion of the fixed crane beam is in butt joint with the hoisting mechanism trolley track on the upper portion of the movable crane beam.
本申请涉及一种行吊梁消防联动时行吊轨道闭合处理结构及其施工方法。适用于行吊轨道闭合处理领域。技术方案包括:钢筋骨架、行吊梁牛腿、可移动行吊梁用牛腿支架、预埋板件、可移动行吊梁带滑轮底座支座、可移动行吊梁、联动驱动电机支架、固定行吊梁和防火卷帘门单元;可移动行吊梁带滑轮底座支座与预埋板件焊接连接;可移动行吊梁安装在可移动行吊梁带滑轮底座支座上;联动驱动电机支架与预埋板件焊接连接;在联动驱动电机支架上设有双联动驱动电机,双联动驱动电机运转时带动可移动行吊梁纵向移动;固定行吊梁安装于可移动行吊梁的一侧,在与可移动行吊梁合拢时,固定行吊梁上部的起升机构小车轨道与可移动行吊梁上部的起升机构小车轨道对接。
Traveling crane rail closing treatment structure during traveling crane beam fire-fighting linkage and construction method thereof
行吊梁消防联动时行吊轨道闭合处理结构及其施工方法
2024-06-11
Patent
Electronic Resource
Chinese
IPC: | B66C Krane , CRANES |