The invention discloses a method for solving staged dense passing demands of hydropower station workers, relates to the technical field of internal passing of the hydropower station workers, and aims to fully mobilize existing traffic equipment in a dam area by combining actual working conditions of a site, solve the problem of personnel traffic congestion in peak hours of the hydropower station and improve the working efficiency of the hydropower station. A traffic route with the shortest waiting time is provided for the passing personnel, so that the operators in the hydropower station dam area can quickly arrive at the site, and the working time of the operators in the hydropower station area is effectively prolonged.
本发明公开了水电站作业人员阶段性密集通行需求解决方法,涉及水电站工作人员内部通行技术领域,结合现场的实际工作情况,通过该方案的实施可充分调动坝区现有交通设备,解决了水电站高峰时段人员通行拥堵现象,为通行人员提供一条等待时间最短的交通路线,实现水电站坝区内作业人员快速的到达现场,有效提高了水电站区域内人员的工作时间。
Method for solving staged dense passage demand of hydropower station operating personnel
水电站作业人员阶段性密集通行需求解决方法
2024-07-26
Patent
Electronic Resource
Chinese
IPC: | G08G Anlagen zur Steuerung, Regelung oder Überwachung des Verkehrs , TRAFFIC CONTROL SYSTEMS |
Fish Passage 2018 & Hydropower Symposium
Catalogue agriculture | 2018
|Slidable vertical ladder for escape passage and personnel passage
European Patent Office | 2021
|Andritz Hydro wins hydropower station order
Online Contents | 2009
Andritz Hydro wins hydropower station order
Online Contents | 2009