The invention discloses a slideway beam load test device, which comprises a slideway beam and a slideway beam sling, the slideway beam sling is connected to the slideway beam, the slideway beam sling is connected with a tension meter through a first shackle, the tension meter is connected with a second shackle, the second shackle is connected with a first hoisting tackle, and the first hoisting tackle is connected with a second hoisting tackle. The first hoisting tackle is connected with a second hoisting tackle through a steel wire rope, the second hoisting tackle is connected with a hanging belt, the hanging belt is connected with a balancing weight, the steel wire rope is connected with a winch, and the winch drives the second hoisting tackle connected with the steel wire rope to move upwards so that the balancing weight can be hoisted. According to the slideway beam load test device provided by the invention, a slideway beam load test method of fixed chain block and manual pulling is improved, the chain block which needs to damage a deck connection fixed dead point is replaced by the pulley block, the fixed dead point is replaced by the balancing weight, and the slideway beam load test device is simple and convenient to mount, dismount and move, good in economical efficiency and high in reliability. The slide beam is suitable for a multi-point load test.
本发明公开了一种滑道梁载荷试验装置,该滑道梁载荷试验装置包括滑道梁和滑道梁吊带,滑道梁吊带连接在滑道梁上,滑道梁吊带通过第一卸扣与拉力计连接,拉力计上连接有第二卸扣,第二卸扣上连接有第一起重滑车,第一起重滑车通过钢丝绳连接有第二起重滑车,第二起重滑车上连接有吊带,吊带与配重块连接,钢丝绳与卷扬机连接,卷扬机带动与钢丝绳连接的第二起重滑车向上运动,以使配重块起吊。本发明提供的滑道梁载荷试验装置对固定倒链、人力拉拽的滑道梁载荷试验方法进行了改进,将需要破坏甲板连接固定死点的倒链替换为滑轮组,将固定死点替换为配重块,安装、拆卸、移动简便,经济性好,适用于需进行多点载荷试验的滑道梁。
Slideway beam load test device
一种滑道梁载荷试验装置
2024-12-10
Patent
Electronic Resource
Chinese