The invention discloses a high-speed rail box girder retaining wall lifting and distributing construction device and method, and relates to the technical field of high-speed rail box girder retaining wall construction. The high-speed rail box girder retaining wall lifting and distributing construction device comprises a lifting platform truck, and the lifting platform truck comprises a walking chassis and a lifting platform mechanism arranged on the walking chassis; the lifting platform mechanism can be arranged and connected to one side of the box girder to construct a construction lifting conveying channel of the upper box girder and the lower box girder so as to convey construction materials and construction equipment between the ground and the top face of the box girder. The material distribution pouring vehicle can move up and down the box girder through the lifting platform mechanism so as to transfer concrete for pouring, and can pour the concrete into the box girder retaining wall pouring cavity; and the carrying equipment is used for carrying construction materials and can go up and down the box girder through the lifting platform mechanism. The construction efficiency of the high-speed rail box girder retaining wall can be improved, equipment and mold turnover is flexible and fast, and the manual labor intensity and the construction cost are reduced.

    本发明公开了一种高铁箱梁挡墙举升布料施工装置及施工方法,涉及高铁箱梁挡墙施工技术领域,包括升降平台车,升降平台车包括行走底盘和设置在行走底盘上的升降平台机构,升降平台机构可布置衔接在箱梁一侧以构建上下箱梁的施工升降输送通道,以在地面与箱梁顶面之间输送施工物料和施工设备;布料浇筑车,布料浇筑车可通过升降平台机构上下箱梁以转运浇筑用混凝土,并可向箱梁挡墙浇筑腔中浇灌混凝土;搬运设备,用于搬运施工物料,搬运设备可通过升降平台机构上下箱梁。本发能够提高高铁箱梁挡墙施工效率,设备及模具周转灵活快捷,降低了人工劳动强度和施工成本。


    Access

    Download


    Export, share and cite



    Title :

    High-speed rail box girder retaining wall lifting and distributing construction device and construction method


    Additional title:

    一种高铁箱梁挡墙举升布料施工装置及施工方法


    Contributors:
    GUO HUALEI (author) / WANG YADONG (author) / DONG XUEYANG (author) / WANG WENXUE (author) / LI XIANGDA (author) / WU BIAO (author) / ZHAO GUANG (author) / MEI YANG (author) / QIN JIANGHAI (author) / FU XIAOQIANG (author)

    Publication date :

    2025-02-18


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E02D FOUNDATIONS , Gründungen / B60P Fahrzeuge zum Transport von Lasten oder zum Befördern, Tragen oder Aufnehmen besonderer Lasten oder Gegenstände , VEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS / B66F HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD , Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last / E01D BRIDGES , Brücken / E04G SCAFFOLDING , Baugerüste



    Crane for high-speed rail prefabricated box girder construction

    CUI WEIHUA / ZHOU LIMIN / GAO SIQING et al. | European Patent Office | 2020

    Free access


    Nut installation auxiliary tool for high-speed rail box girder lifting appliance

    FU YANPING / FENG JIA / JIANG LONG et al. | European Patent Office | 2023

    Free access

    Rail type lifting platform for curtain wall engineering construction

    GAO PENG | European Patent Office | 2022

    Free access

    Construction method for inner support of concrete retaining wall van type rail car

    FAN XIAODONG / CHEN HEDONG / SONG WENBO et al. | European Patent Office | 2024

    Free access