The invention relates to the technical field of underground diaphragm wall construction, in particular to a hoisting perpendicularity control method for an assembly type underground diaphragm wall in a slurry environment, which comprises the following steps: S1, hoisting the prefabricated underground diaphragm wall to a position above a formed groove through a crane, and then slowly lowering the prefabricated underground diaphragm wall into the formed groove; s2, arranging a clamping device, and enabling the clamping device to slide into the formed groove along with the flange of the prefabricated diaphragm wall; s3, adjusting air cylinders on the two sides of the clamping device to enable the prefabricated diaphragm wall to be perpendicular to the formed groove; s4, perpendicularity detection is conducted on the lowered prefabricated diaphragm wall through the inclinometer, and if the perpendicularity does not reach the standard, the prefabricated diaphragm wall continues to pass through the adjusting air cylinder and the lifting rope; s5, if the perpendicularity reaches the standard, a filling water bag is placed; s6, after water is injected into the filling water bag, the clamping device starts to be recycled; and S7, after the clamping device leaves the formed groove, concrete is poured into a gap between the formed groove and the prefabricated diaphragm wall, initial setting is waited, the filling water bag is recycled, and construction is completed.

    本申请涉及地连墙施工技术领域,尤其是一种装配式地连墙泥浆环境下吊装垂直度控制方法,S1、通过吊车将预制地连墙垂吊到成槽上方,再缓缓下放到成槽中;S2、设置夹持装置,让其随着预制地连墙的凸缘滑落下到成槽中;S3、通过夹持装置两侧调节气缸,让预制地连墙垂直在成槽中;S4、再通过测斜仪对下放的预制地连墙进行垂直度检测,若垂直度没有达标,则继续通过调节气缸和吊绳;S5、若垂直度达标则,放置填充水囊;S6、当填充水囊内部注水完成后,开始回收夹持装置;S7、当夹持装置离开成槽中后,开始在成槽和预制地连墙之间的缝隙中浇筑混凝土,等待初凝,将填充水囊回收,完成施工。


    Access

    Download


    Export, share and cite



    Title :

    Method for controlling hoisting perpendicularity of fabricated diaphragm wall in slurry environment


    Additional title:

    一种装配式地连墙泥浆环境下吊装垂直度控制方法


    Contributors:
    ZHOU WU (author) / XIANG LING (author) / YANG WENXUAN (author) / LIU QINWEN (author) / ZENG GUANGXI (author) / GENG DONGFENG (author) / CHEN YUN (author) / CHEN SHUIQUAN (author)

    Publication date :

    2025-04-08


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66C Krane , CRANES / F16F SPRINGS , Federn / E02D FOUNDATIONS , Gründungen



    Perpendicularity control method of hoisting frame

    WEI MINGZHUAN / CAI DONGBO / CHAI SHAOQIANG et al. | European Patent Office | 2024

    Free access

    Construction method for controlling installation perpendicularity of CT clamping groove assembly type underground diaphragm wall

    JIA JIANWEI / ZHANG DAMING / LIU SHAOPENG et al. | European Patent Office | 2025

    Free access

    Hoisting construction method for large-tonnage super-long fabricated diaphragm wall component

    HE SHUBO / JIANG JINBO / YANG WENXUAN et al. | European Patent Office | 2023

    Free access

    Hoisting and mounting integrated construction method for prefabricated wall pieces of fabricated diaphragm wall

    WANG JIN / ZENG XIANGJI / BAO YANGYANG et al. | European Patent Office | 2025

    Free access

    Underground diaphragm wall reinforcement cage hoisting method

    CHEN ZHONG / CHEN XIANGYU / ZHU FEI | European Patent Office | 2021

    Free access