The invention discloses a boom simulation method for crawler crane construction, computing equipment and a readable storage medium, and the method comprises the following steps: in response to a parameter setting operation input in a boom simulation interface, obtaining basic data of a target crawler crane and target construction parameters corresponding to a target boom combination form; the basic data comprises equipment basic data; on the basis of the basic data and the target construction parameters, carrying out suspension arm simulation on a target load hoisted by the target crawler crane in the target cantilever crane combination form, and determining and outputting a hoisting scheme under the target construction parameters; the hoisting scheme comprises the lifting height and the operation range. Therefore, the hoisting scheme of the crawler crane can be accurately simulated and output, and the construction efficiency and safety of the crawler crane are improved.
本申请公开了一种履带吊施工的吊臂模拟方法、计算设备及可读存储介质,包括:响应于在吊臂模拟界面输入的参数设置操作,获取目标履带吊的基础数据和目标臂架组合形式对应的目标施工参数;基础数据包括设备基本数据;基于基础数据和目标施工参数,对目标履带吊在目标臂架组合形式下吊装目标载荷进行吊臂模拟,确定并输出在目标施工参数下的吊装方案;吊装方案包括起升高度和作业幅度。如此,能够准确对履带吊的吊装方案进行模拟与输出,提高了履带吊施工的效率和安全性。
Suspension arm simulation method for crawler crane construction, computing equipment and readable storage medium
履带吊施工的吊臂模拟方法、计算设备及可读存储介质
2025-04-08
Patent
Electronic Resource
Chinese
CRAWLER CRANE TRANSPORT METHOD, CRAWLER CRANE HANGING MEMBER, AND CRAWLER CRANE
European Patent Office | 2024
|CRAWLER CRANE, AND TRANSPORTATION METHOD OF CRAWLER CRANE
European Patent Office | 2024
|