The invention discloses a method for dismantling a waste anchoring type dock wall in a dry environment. The method comprises the steps that S1, early-stage preparation is conducted; s2, the anchoring system is dismantled; s3, the dock wall structure is dismantled; s4, the steel sheet pile is pulled out; wherein the early-stage preparation stage comprises the step of arranging a displacement settlement observation point, a deep soil mass displacement meter and an underground water level observation well at the top of an excavation design slope so as to monitor the stress change condition of a soil mass. According to the method, by optimizing the dismantling process and accurately controlling the dismantling standard, the dismantling operation of the dock wall can be efficiently and safely completed, and the problems of soil instability and the like caused by dismantling can be effectively avoided.
本发明公开了一种干环境下废旧锚拉式坞墙拆除方法,包括:步骤S1,前期准备;步骤S2,锚拉体系拆除;步骤S3,坞墙结构拆除;步骤S4,钢板桩拔除;其中,前期准备阶段,包括:在开挖设计边坡顶部设置位移沉降观测点、深部土体位移计、地下水位观测井,以监测土体受力变化情况。本发明通过优化拆除流程和精确控制拆除标准,不仅能够高效、安全地完成坞墙的拆除作业,还可有效避免因拆除引发的土体失稳等问题。
Method for dismantling waste anchoring type dock wall in dry environment
一种干环境下废旧锚拉式坞墙拆除方法
2025-04-25
Patent
Electronic Resource
Chinese
IPC: | B63C LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS , Zuwasserlassen, Trockenstellen, Docken oder Bergen von Schiffen |
Method for dismantling waste invalid horizontal dock gate
European Patent Office | 2025
|DRY DOCK FOR BUILDING AND/OR DISMANTLING NAVAL STRUCTURES
European Patent Office | 2020
|Dry dock for building and/or dismantling navel structures
European Patent Office | 2021
|DRY DOCK FOR BUILDING AND/OR DISMANTLING NAVEL STRUCTURES
European Patent Office | 2019
|DRY DOCK FOR BUILDING AND/OR DISMANTLING NAVEL STRUCTURES
European Patent Office | 2017
|