The invention discloses a joint processing method for connection of a large tower crane attached wall and a fabricated outer wall. The joint processing method comprises the following steps that S1, the position of a tower crane foundation is determined; before building foundation construction, a tower crane manufacturer, a tower crane model and the position of a tower crane foundation need to be synchronously determined, and the factors are directly related to the horizontal distance of a tower crane wall-attached fulcrum, the vertical distance between a tower body and the wall-attached fulcrum and the distance between a tower crane wall-attached fulcrum and the tower crane wall-attached fulcrum; s2, determining a tower crane wall-attached model selection; when a wall attaching scheme is formulated, wall attaching components with proper sizes and models need to be selected strictly according to an operating instruction of the tower crane and in combination with the arrangement condition of prefabricated building PC components, and the problems that the wall attaching distance of the tower crane is too small or too large, the wall attaching length is too long, and the angle is too small or too large are avoided. The problem of adverse factors of connection of the tower crane attached wall and the fabricated building outer wall is effectively solved, the influence of the attached wall on the fabricated building outer wall structure is reduced, and the use safety of the tower crane is ensured.

    本发明公开了一种大型塔吊附墙与装配式外墙连接的节点处理方法,包括以下步骤:S1:确定塔吊基础位置;在楼栋基础施工前,需要同步明确塔吊厂家、塔吊型号、塔吊基础的位置,上述因素直接关系到塔吊附墙支点的水平距离、塔身距附墙支点的垂直距离与塔吊附墙的间距;S2:确定塔吊附墙选型;制定附墙方案时需要严格按照塔吊使用说明书及结合装配式建筑PC构件布置情况,从而选择合适尺寸及型号的附墙部件,避免塔吊附墙的间距偏小或偏大、附墙的长度超长以及角度过小或过大,本发明有效解决塔吊附墙与装配式建筑外墙连接的不利因素,减小附墙对装配式建筑外墙结构的影响,确保塔吊使用安全性。


    Access

    Download


    Export, share and cite



    Title :

    Joint processing method for connection of large tower crane attached wall and fabricated outer wall


    Additional title:

    一种大型塔吊附墙与装配式外墙连接的节点处理方法


    Contributors:
    ZHAO ZHI (author) / HU YANG (author) / ZHANG YONGSHENG (author) / YUE YANGUO (author) / TANG YANLI (author)

    Publication date :

    2025-05-02


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66C Krane , CRANES



    Fabricated tower crane attached wall for reducing main pier

    LIU HONGBO / LI JINHUI / WENG ZHENQIN et al. | European Patent Office | 2023

    Free access


    Wall-attached node structure of tower crane

    YU SHUNLIANG / GONG XIN / LIU YUNDONG et al. | European Patent Office | 2024

    Free access

    Wall-attached structure of tower crane and construction method of wall-attached structure

    WANG XIAOLIN / ZHANG MING / CHEN GUOXIANG et al. | European Patent Office | 2022

    Free access

    Tower crane wall-attached mounting operation platform

    WU JIANGUO | European Patent Office | 2020

    Free access