The invention provides a method for adding hoisting equipment to an absorption tower and the absorption tower with the hoisting equipment. According to the method for additionally installing the hoisting equipment on the absorption tower, at least part of the top of the absorption tower is an inclined plane, and the method for additionally installing the hoisting equipment on the absorption tower comprises the following steps that S1, the maximum load of a fixing frame on the top of the absorption tower is calculated, and the hoisting equipment is selected; the sum of the mass of the hoisting equipment and the maximum mass of articles capable of being hoisted by the hoisting equipment is smaller than the maximum load of the fixing frame; s2, a mounting frame is arranged on the fixing frame, and the upper surface of the mounting frame is a horizontal plane; s3, a stand column foundation of the hoisting equipment is fixed to the upper surface of the mounting frame; and S4, lifting equipment is lifted to the top of the absorption tower through a lifting appliance and connected with the stand column foundation. According to the method for additionally installing the hoisting equipment on the absorption tower, the hoisting equipment can be arranged on the top of the absorption tower, so that the convenience of transporting articles on the absorption tower is improved.
本发明提出一种吸收塔加装起重设备方法和具有起重设备的吸收塔。本发明的吸收塔加装起重设备方法,吸收塔的顶部的至少部分为斜面,吸收塔加装起重设备方法包括以下步骤:S1、计算吸收塔的顶部的固定架的最大载荷并选择起重设备,以使得起重设备的质量与起重设备可吊装的物品最大质量之和小于固定架的最大载荷;S2、在固定架上设置安装架,且安装架的上表面为水平面;S3、将起重设备的立柱基础固定在安装架的上表面上;S4、利用吊具将起重设备吊装至吸收塔的顶部并与立柱基础相连。根据本发明的吸收塔加装起重设备方法使得吸收塔的顶部设置起重设备可行,从而便于提高在吸收塔上运输物品的便利性。
Method for installing hoisting equipment on absorption tower and absorption tower with hoisting equipment
吸收塔加装起重设备方法和具有起重设备的吸收塔
2025-05-23
Patent
Electronic Resource
Chinese
Iron tower installation hoisting equipment and hoisting method
European Patent Office | 2025
|Electric power group tower hoisting equipment and hoisting method
European Patent Office | 2024
|