A train operation control system 100 includes: a headcount estimation device 2 that estimates the number of people in a train and the number of people on a platform 30 by using video data outputted from a plurality of on-board cameras 23 and a plurality of ground cameras 1; and a train rescheduling device 9 that predicts a dwell time required for passengers to board and detrain from the train using the estimated headcount information estimated by the headcount estimation device 2 and schedule information stored in an operation management device 8, and accordingly performs train operation rescheduling. The train operation control system can predict the dwell time accurately and accordingly perform train operation rescheduling even when the number of passengers fluctuates.
TRAIN TRAFFIC CONTROL SYSTEM AND TRAIN TRAFFIC CONTROL METHOD
ZUGVERKEHRSTEUERUNGSSYSTEM UND ZUGVERKEHRSTEUERUNGSVERFAHREN
SYSTÈME DE COMMANDE DE TRAFIC DE TRAIN ET PROCÉDÉ DE COMMANDE DE TRAFIC DE TRAIN
2021-12-01
Patent
Electronic Resource
English
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
TRAIN TRAFFIC CONTROL SYSTEM AND TRAIN TRAFFIC CONTROL METHOD
European Patent Office | 2017
|TRAIN TRAFFIC CONTROL INSPECTION DEVICE, TRAIN TRAFFIC CONTROL INSPECTION METHOD AND PROGRAM
European Patent Office | 2015
|Train traffic control inspection device, train traffic control inspection method and program
European Patent Office | 2017
|TRAIN MARSHALLING CONTROL METHOD AND SYSTEM, TRAIN, AND TRAFFIC CONTROL SYSTEM
European Patent Office | 2023
|