PROBLEM TO BE SOLVED: To shorten an alarm time by including adjacent one or a plurality of railroad crossings.SOLUTION: A railroad crossing control system comprises an operation management device 24 for managing operation of a plurality of trains 2 on the basis of train position information transmitted from an on-board device 10 for constituting a part of a radio train control system and a ground device 22 for giving and receiving a signal of including information or an instruction between the on-board device 10, the railroad crossing control device 12 and the operation management device 24, the operation management device 24 sends out a suppression instruction for temporarily stopping operation of a train 2 to the ground device 22, and the ground device 22 of receiving the suppression instruction indicates the setting of a stopping limit to the on-board device 10, and indicates interruption of alarm control to the railroad crossing control device 12.SELECTED DRAWING: Figure 1
【課題】隣接する1または複数の踏切を含めて警報時間の短縮化を図ること。【解決手段】無線列車制御システムの一部を構成する車上装置10から伝送された列車位置情報に基づいて複数の列車2の運行を管理する運行管理装置24ならびに、車上装置10、踏切制御装置12および運行管理装置24との間で情報または指示を含む信号の授受を行う地上装置22を備え、運行管理装置24は、列車2の運行を一時的に停止する抑止の指示を地上装置22に送出し、抑止の指示を受けた地上装置22は、停止限界の設定を車上装置10に指示すると共に、踏切制御装置12に対して警報制御の中断を指示する。【選択図】図1
RAILROAD CROSSING CONTROL SYSTEM, OPERATION MANAGEMENT SYSTEM AND OPERATION MANAGEMENT DEVICE
踏切制御システム、運行管理システムおよび運行管理装置
2016-08-08
Patent
Electronic Resource
Japanese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
European Patent Office | 2023
|OPERATION MANAGEMENT SYSTEM, OPERATION MANAGEMENT METHOD AND RAILROAD OPERATION SYSTEM
European Patent Office | 2024
|European Patent Office | 2022
|RAILROAD CROSSING OBSTACLE DETECTION SYSTEM AND RAILROAD CROSSING CONTROL DEVICE
European Patent Office | 2024
|