To provide a technique for performing interlocking processing of the whole station with plural interlocking devices implemented with common interlocking data.SOLUTION: A control range (incoming line/outgoing line), in which an object station (A station) is divided, is set to each of two interlocking devices 10A, 10B constituting an interlocking system 1. The interlocking devices 10A, 10B are respectively implemented with interlocking data 5 common in the whole object station, and an interlocking logic part 20 performs interlocking processing of the whole object station according to the interlocking data 5, controls on-site apparatuses 7A, 7B in an own control range on the basis of the processing result, and acquires information on all on-site apparatuses 7 in the object station by transmitting and receiving information on the on-site apparatuses 7A, 7B in the own control range with other interlocking devices 10.SELECTED DRAWING: Figure 1
【課題】共通の連動データを実装した複数の連動装置による駅全体の連動処理を行う技術を提供すること。【解決手段】連動システム1を構成する2台の連動装置10A,10Bそれぞれには、対象駅(A駅)を分割した制御範囲(上り線/下り線)が設定されている。連動装置10A,10Bそれぞれは対象駅全体の共通の連動データ5を実装しており、連動論理部20は、この連動データ5に従った対象駅全体の連動処理を行い、その処理結果に基づいて自制御範囲の現場機器7A,7Bを制御するとともに、自制御範囲内の現場機器7A,7Bに関する情報を他の連動装置10との間で送受信することで、対象駅の全ての現場機器7に関する情報を取得する。【選択図】図1
INTERLOCKING DEVICE
連動装置
2019-01-10
Patent
Electronic Resource
Japanese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |