A load management system for managing loads in a power distribution grid. The load management system includes a control unit and at least two current transformers, which are each connected to the control unit by a signal cable. A first current transformer of the at least two current transformers is arranged in the power distribution grid such that the first current transformer is suitable for measuring a current level that is dominant in a grid connecting line of the power distribution grid, which grid connecting line is connected to a power supply company. A second current transformer of the at least two current transformers is arranged in the power distribution grid such that the second current transformer is suitable for measuring the current level that is dominant in a power line of the power distribution grid, which power line feeds at least one charging station of the power distribution grid.
LOAD MANAGEMENT SYSTEM AND METHOD FOR CONTROLLING SUCH A LOAD MANAGEMENT SYSTEM
2021-05-13
Patent
Electronic Resource
English
Load-dependent trailer brake system and method of controlling such
European Patent Office | 2018
LOAD-DEPENDENT TRAILER BRAKE SYSTEM AND METHOD OF CONTROLLING SUCH
European Patent Office | 2019
|Load-dependent trailer brake system and method of controlling such
European Patent Office | 2022
|