Planning Columbus on-board operations and management of the operational interfaces of the payload ground control team are discussed. Organizational aspects which need to be considered to arrive at a feasible operations structure are assessed, based on Spacelab experience.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Timelining and Operations Integration Concerning APM (Attached Pressure Module) and MTFF (Man Tended Free Flyer)


    Contributors:

    Publication date :

    1988


    Size :

    9 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English