This Acceptance/Operational Test Procedure (ATP/OTP) will document the satisfactory operation of the camera purge panel, purge control panel, color camera system and associated control components destined for installation. The final acceptance of the complete system will be performed in the field. The purge panel and purge control panel will be tested for its safety interlock which shuts down the camera and pan-and-tilt inside the tank vapor space during loss of purge pressure and that the correct purge volume exchanges are performed as required by NFPA 496. This procedure is separated into seven sections. This Acceptance/Operational Test Report documents the successful acceptance and operability testing of the 241-AN-104 camera system and camera purge control system.
Acceptance/Operational Test Report for Tank 241-AN-104 camera and camera purge control system
1995
25 pages
Report
No indication
English
Radiation Pollution & Control , Radiation Shielding, Protection, & Safety , Radioactive Wastes & Radioactivity , Reactor Fuels & Fuel Processing , Selected Studies In Nuclear Technology , Photographic Techniques & Equipment , Cameras , Hanford Reservation , Radioactive Waste Storage , Tanks , Control Systems , Pressure Control , Vapors , EDB/052002 , EDB/054000