The study, conducted by Barton-Aschman Associates, was funded by the U.S. Trade and Development Agency on behalf of the Government of the State of Baja California, Mexico. The report shows the results of a Light Rail Feasibility Study conducted for the City of Tijuana. It includes an evaluation of all public transit services within the city and gives a summary of the principal activities of the study, including the results of a technical evaluation to identify the most important characteristics of the public transit system. The report is divided into the following sections: (1) Introduction; (2) Reports; (3) Demand Forecasts; (4) Feasibility of Light Rail; (5) Conclusions; (6) Recommendations for the Medium Term; and (7) Long Term Recommendations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Transportation Plan for the City of Tijuana, Mexico: Product 7.5. Final Report


    Publication date :

    1994


    Size :

    104 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English








    Improving urban transportation in Mexico City

    Stoveken, P. / Cooperation for the Continuing Development of Urban and Subarban Transportation | British Library Conference Proceedings | 2000