Construction of Projects F 019-1(8) and F 019-1(9) commences southerly of the Bennington-Shaftsbury Town Line and continues northerly approximately 20 miles on relocation easterly of and more or less parallel to existing US 7 to a point on Vermont Route 11 easterly of Manchester Center. Project F 319-1(10) commences on existing US 7 southerly of Arlington Village and extends approximately 2.0 miles easterly to an intersection with proposed Project F 019-1(8). Projects F 019-1(8) and F 019-1(9) are to be four lane divided highways with initial two lane construction. Right-of-way will be acquired for the ultimate four lane design. Access will be limited to interchange areas. Project F 319-1(10) (Arlington Connector) will be a two lane highway with access controlled to Town Highway Intersections. The adverse environmental effects are expected to be minimal.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    US Route 7, Bennington to Manchester, Vermont. Project F019-1(8), F019-1(9), F319-1(10)


    Publication date :

    1973


    Size :

    460 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English