The proposed project contemplates the widening and lengthening of runway 17-35 from its present 50 ft x 3500 ft dimensions to 75 ft x 3900 ft and to extend the apron area. In conjunction with the runway project will be the relocation of the runway edge lighting and the installation of a VASI system. There will be slight increases in the levels of noise and air pollution, resulting from increased operations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    ADAP Request for Marshall, Missouri


    Publication date :

    1973


    Size :

    28 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English