The report establishes the design criteria for the minimum base support facilities needed to support the technical operations of the Northeast Development/Operational Tracking Station during the initial period of station operation. It was assumed that the station will be operated, maintained, and supported by contractor personnel; that maximum support will be obtained from the surrounding communities; and that maximum use will be made of any existing government buildings or other facilities that satisfy the criteria given herein and are within a reasonable commuting distance of the station. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Base Support Facilities Requirements for the Northeast Development Operational Tracking Station


    Publication date :

    1959


    Size :

    24 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English