This report summarizes the results of TACOM Phase III Demonstration Testing conducted at the General Motors (GM) proving grounds at Milford, Michigan. Testing was conducted January 4 through 18, March 24 through 30, and completed June 7 through June 9, 1983, under the provisions of Contract DAAE07-82-C-4109. The purpose of this program was to demonstrate the characteristics of the Garrett GT601 gas turbine engine mated with a Detroit Diesel Allison (DDA) X-300 transmission, without a torque converter, installed in a mechanized infantry combat vehicle (MICV) loaded to 45,000 pounds gross vehicle weight (GVW).
TACOM (Army Tank-Automotive Command) Phase III MICV/GT601/X-300
1984
31 pages
Report
No indication
English
Army Tank-Automotive Command ( TACOM )
Automotive engineering | 1986
Tank automotive command ( TACOM ) Programs geared toward an effective army fleet
Automotive engineering | 1982
|British Library Conference Proceedings | 1990
|TRACK & SUSPENSION-TACOM PERSPECTIVE
British Library Conference Proceedings | 1990
|