This report documents the development and progress to date of brake test equipment and procedures for heavy-duty transit coach brakes at the Transportation Systems Center. It presents a description of a heavy-duty dynamometer brake test apparatus and specifies proposed test procedures for an evaluation of bonded brake shoe linings. Although many tests were completed, several of the planned dynamometer tests were discontinued as a result of programmatic changes.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Development of Transit Coach Bonded Brake Lining Test Equipment and Test Prodcedures - Progress Report


    Contributors:

    Publication date :

    1984


    Size :

    51 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English