Results of 17 new borings made along Huntington Route in the National Airport area are summarized in the report. It contains a series of geological sections along the proposed subway, logs of the borings, engineering laboratory test results and conclusions regarding subsoil properties. (Author)
Design Section C008: Huntington Route. Subsurface Investigation
1970
40 pages
Report
No indication
English
Metropolitan Rail Transportation , Transportation & Traffic Planning , Subway railways , District of Columbia , Routes , Subsurface investigations , Foundations , Rock mechanics , Soil mechanics , Tunneling(Excavation) , Subsurface structures , Boring , Subsoil , Mass transportation , Urban planning , Foundation engineering , Huntington Route , National Airport Area , Design section C008