This report documents the results of an independent evaluation of JB5 maintenance practices and the data reporting system used for parts life tracking (PLT) of selected life limited components. A major requirement of the study was to quantify the costs/benefits associated with using the D042 Comprehensive Engine Management System (CEMS) for J85 PLT versus the system now in use. The techniques and methodologies used in the analysis are compatible with the philosophy of Reliability-Centered Maintenance (RCM).... J-85, Aircraft engines, Jet engines, Maintenance, Aircraft maintenance.
J85 Cost/Benefit Engine Study
1993
53 pages
Report
No indication
English
Jet & Gas Turbine Engines , Aircraft , Logistics Military Facilities & Supplies , Aircraft engines , Aircraft maintenance , Jet engines , Cost analysis , Costs , Maintenance , Management , Philosophy , Reliability , Requirements , Tracking , Turbojet engines , J85-GE-5 Turbojet engines , Benefit cost analysis
TIBKAT | 1977
|Structures, performance, benefit, cost study
NTRS | 1981
|Item Unique Identification Cost Benefit Study for Legacy Gas Turbine Engine Fleet Maintenance
SAE Technical Papers | 2015
|