Flight testing has undergone some major changes in the past 20 years. The largest single technical change, the need to evaluate software-intensive systems, resulted from advances in computer technology. Test management concepts have changed as well. These changes were influenced in part by technology and in part by a need for the Air Force to become more involved early in the test process. Today's avionics systems present both a quantum leap in capability and a quantum jump in test requirements. With workload growing both in magnitude and complexity, the challenge is to meet the increased demands cost-effectively and safely. For software-intensive systems, a ground-based simulation dedicated to the support of the flight test program is essential. This paper summarizes today's methods of operation which are geared to minimizing development time and costs. The focus of this process is on productivity -- doing the right testing in the proper sequence in the most efficient and safest possible manner.
Minimizing Development Flight Test Time and Cost in the US Air Force
1987
8 pages
Report
No indication
English
Minimizing Implementation Time and Cost for MES Projects
British Library Conference Proceedings | 1996
|Air Force Flight Test Instrumentation System
AIAA | 1983
|Development of a Low-Cost and Versatile Flight Test Platform
Online Contents | 1997
|