Contents: Contract plans and specifications; Shipyard facilities survey; Hydrodynamics and model tests; Structural design and analysis; Stress analysis; Arrangement; Positioning units; Vessel positioning system; Power plant; Communications and navigation equipment; Marine personnel requirements.
Project Mohole Scientific and Technical Progress for the Period Ending September 15, 1964: Naval Architecture, Marine Engineering , and Instrumentation Section
1964
25 pages
Report
No indication
English
Geology & Geophysics , Well logging , Feasibility studies , Contracts , Specifications , Shipyards , Hydrodynamics , Model tests , Structural properties , Analysis , Stresses , Floats , Design , Marine engineering , Propellers(Marine) , Marine propulsion , Power , Communication systems , Navigation , Personnel , Instrumentation , Mohole project , Drilling vessels