The project, located in Manitowoc County, Wisconsin in the city of Manitowoc extends easterly along Waldo Boulevard (USH 10 and STH 42) approximately 2.6 miles to a junction with Memorial Drive. The purpose of this project is to reconstruct the existing facility and provide left turn lanes where traffic projections indicate heavy turning movements. There will be improved safety and capacity of Waldo Boulevard. The acquisition of lands for right of way and the removal of existing trees will be required.
Project F019-4(); ID 1474-0-00, Waldo Boulevard, (City of Manitowoc), S.T.H. and U.S.H. 10 Manitowoc County, Wisconsin
1973
34 pages
Report
No indication
English
Engineering Index Backfile | 1919
Industrynews - Manitowoc Strengthens Global Presence
Online Contents | 2001