The report is a contingency and preconstruction study of the Alyeska Pipeline Service Company on the laying and operating of the pipeline. Included are the following subjects: Pipe; Pump stations; Marine terminal; Pipeline control, Pipeline construction; Maintenance; Oil spills; Permafrost; Thermal erosion; Vegetation and revegetation; Seismic considerations; Scour and hydrology; Thermal pollution; Aufeis; Fish and Wildlife; Air pollution; Noise; Forest Fires; Waste Disposal.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Trans-Alaska Pipeline. Exhibits, Washington, D.C. Volume II


    Publication date :

    1971


    Size :

    552 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English