The SY-101 Equipment Removal System 100 Ton Hydraulic Trailer was designed and built by KAMP Systems, Inc. Performance of the Acceptance Test Procedure at KAMP's facility in Ontario, California (termed Phase 1 in this report) was interrupted by discrepancies noted with the main hydraulic cylinder. The main cylinder was removed and sent to REMCO for repair while the trailer was sent to Lampson's facility in Pasco, Washington. The Acceptance Test Procedure was modified and performance resumed at Lampson (termed Phase 2 in this report) after receipt of the repaired cylinder. At the successful conclusion of Phase 2 testing the trailer was accepted as meeting all the performance criteria specified.
Acceptance test report for the Westinghouse 100 ton hydraulic trailer
1995
109 pages
Report
No indication
English
Radioactive Wastes & Radioactivity , Radiation Shielding, Protection, & Safety , Tooling, Machinery, & Tools , Hanford Reservation , Materials Handling Equipment , Pumps , Radioactive Waste Storage , Constraints , Experimental Data , Hydraulic Equipment , Hydrogen , Materials Handling , Mitigation , Performance Testing , Safety Engineering , Tables(data) , EDB/054000 , EDB/052002
Diesel generator trailer acceptance test procedure
NTIS | 1994
|Breathing air trailer acceptance test procedure
NTIS | 1994
|