Progress in the procurement of eleven (11) Allison GT 404-4 gas turbine engines and five (5) HT74OCT and six (6) V730CT Allison automatic transmissions and the required associated software for the bus demonstration programs is reported. All hardware items have been defined and are released for procurement. Engine and transmission hardware is being received, and is approximately 25% completed at this time. The September 1978 Cost Report and engine and transmission installation drawings were delivered to the DOE on schedule. The program is progressing as planned and all items are on schedule for delivering the first engine/transmission at the end of April 1979. (ERA citation 04:030744)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Gas Turbine Engines and Transmissions for Bus Demonstration Programs. Technical Status Report, August 28, 1978--October 30, 1978


    Contributors:

    Publication date :

    1978


    Size :

    7 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English