Extensive modifications to the Navy Experimental Diving Unit Hyperbaric Facility were performed by the Portsmouth New Hampshire Naval Shipyard during 1971. This report describes and documents the modifications which consist of installing penetrators, modifying hatch seals, magnetic particle testing welds and repair welding performed on the pressure hull. (Author)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Portsmouth Naval Shipyard Chamber Modifications. 1971


    Contributors:
    R. Y. Iha (author)

    Publication date :

    1972


    Size :

    17 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Keeping Old Running as New at Portsmouth Naval Shipyard

    Harris, Lukian / Riden, Kirk / Somma, Danielle et al. | ASCE | 2022


    Radiological Survey of Portsmouth Naval Shipyard, Kittery, Maine, and Environs

    R. S. Callis / S. T. Windham / C. R. Phillips | NTIS | 1979



    The ideal naval shipyard

    Gluse, M.R. | Tema Archive | 1989


    Naval Shipyard Machine Shop Modernization

    K. C. Doehnert / B. Winton | NTIS | 1993