This document provides the information and procedures required to install a modified Class B riser moor, with sinkers, in the Piscataqua River near the Simplex Cable and Wireless Company, Newington, New Hampshire. The project is referred to as the Simplex Moor. Contained in this document is a description of the moor, the implant schedule, staging and preassembly requirements and the detailed operational scenario. The moor installation is in response to a task initiated by the Naval Electronic Systems Command (NAVELEX). Moor design, acquisition and installation planning is the responsibility of the Chesapeake Division of the Naval Facilities Engineering Command (CHESDIV). The U.S. Coast Guard, First District, has accepted a request from CHESDIV to provide an installation vessel and crew. A brief synopsis of the Simplex Moor participants and their major function is provided.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Simplex Moor Installation Plan


    Contributors:
    A. Sutherland (author) / R. Asher (author) / L. Mendlow (author)

    Publication date :

    1978


    Size :

    61 pages


    Type of media :

    Report


    Type of material :

    No indication


    Language :

    English




    Moor Bridge, Nottingham

    Little, F.M. | Engineering Index Backfile | 1940


    Redevelopment of The Moor

    British Library Online Contents | 2013



    Apparatus for moor floating platform

    European Patent Office | 2016

    Free access